Liquids & Drinks · Dairy & Cultured
Aseptic Filling Line OEE
Sustain the aseptic envelope while lifting OEE from 74% to 88% on multi-format dairy filling lines.
How Allie Works Here
From signal to action in real time.
The Production Optimization agent classifies every OEE loss by machine, format, and cause within 60 seconds, distinguishing aseptic envelope breaches (which trigger a sterilization re-cycle) from mechanical microstops and changeover ramp losses. The Process Control agent monitors sterilization tunnel exit temperature and adjusts steam injector setpoint via Tetra Pak OPC-UA writes before deviation triggers an envelope breach. The Predictive Maintenance agent tracks sealing-jaw servo torque curves and forming-roller bearing signatures, scheduling component replacement during planned cleans rather than reactively. The Quality Control agent traces seal defect events to specific upstream causes such as cracked sealing strips or off-center carton presentation, with corrective recommendations surfaced to the line lead.
Machines & Connectivity
OT-connected, protocol-native.
Aseptic carton filler for UHT milk and cultured products; primary OEE-constrained machine on the line
Gable-top carton filler for ESL dairy products; format-change machine for size and design variants
Line controller integrating filler permissives, sterilization gates, and downstream case-packer signals
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Filler Speed | DFIL01.SPD.UPM | units/min | 240–320 | 300–320 | Higher |
| Sterilization Tunnel Exit Temperature Deviation | DFIL01.STR.DEV | °C | ±4 | ±1.2 | Tighter |
| Aseptic Envelope Breach Events per Week | DFIL01.AEB.WK | events/wk | 2.4 | 0.3 | Lower |
| Carton Seal Defect Rate | DFIL01.SEAL.DEF | % | 0.6–1.4 | 0.1–0.3 | Lower |
DFIL01.SPD.UPMDFIL01.STR.DEVDFIL01.AEB.WKDFIL01.SEAL.DEFIn the Field
"a major Latin American dairy group operating aseptic carton lines on both Tetra Pak and Elopak platforms across multiple plants"
Deployed at a major Latin American dairy group operating aseptic carton lines on both Tetra Pak and Elopak platforms across multiple plants. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.