Liquids & Drinks · Beer & Brewing

CIP Cycle Optimization

Replace fixed-timer rinse steps with sensor-confirmed clean endpoints to recover 2+ production hours per day.

−32%
CIP Duration
−24%
Chemical Costs
+2.1 hrs/day
Production Uptime

How Allie Works Here

From signal to action in real time.

Production PlanningEnergy OptimizationProcess Control

The Process Control agent monitors Hach turbidity and conductivity in real time during the rinse phase and terminates the rinse step when turbidity drops below 3 NTU, replacing the fixed 15-minute rinse timer. The Production Planning agent schedules CIP windows aligned with production plan gaps rather than fixed shift boundaries, presenting operators with a predicted CIP-complete time based on current queue and circuit soil load estimate. The Energy Optimization agent reduces hot water temperature setpoint from 85°C to 75°C for lightly-soiled circuits and sequences circuits to reuse heat from preceding runs.

Machines & Connectivity

OT-connected, protocol-native.

Sani-Matic CIP System
Sani-Matic
OPC-UA

Central CIP skid distributing caustic, acid, and rinse circuits to fermenter vessels and packaging lines

Hach Digital Analyzer
Hach
Modbus TCP

Real-time turbidity and conductivity measurement in CIP return line to validate circuit cleanliness

ABB IRC5 Automation Controller
ABB
OPC-UA

Manages CIP valve sequencing and chemical dosing across 12 circuits simultaneously

Process Variables

The signals Allie monitors and moves.

Caustic Concentration in CircuitTighter
CIP01.CAUS.CONC
Baseline: 1.5–2.5 %1.9–2.1 %
Return Turbidity at Rinse EndLower
CIP01.TURB.RET
Baseline: ≤8 NTU≤3 NTU
Total CIP Duration per CircuitLower
CIP01.DUR.CIRC
Baseline: 68–95 min52–62 min
Hot Water Consumption per CircuitLower
CIP01.H2O.CIRC
Baseline: 840–1200 L680–780 L

In the Field

"a beverage company running 12 CIP circuits across fermentation and packaging blocks at a greenfield facility"

Deployed at a beverage company running 12 CIP circuits across fermentation and packaging blocks at a greenfield facility. The results above reflect production data from the 60–90 day period following full deployment.

−32%cip duration
−24%chemical costs
+2.1 hrs/dayproduction uptime

Next Step

See what your lines are actually capable of.

A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.