Liquids & Drinks · CSD & Juice
Carbonation Consistency
Cut CO2 volume variance by 74% and eliminate dissolved oxygen exceedances that flatten product in trade.
How Allie Works Here
From signal to action in real time.
The Process Control agent monitors Anton Paar CO2 volume readings at 2-second intervals and applies a temperature-compensation model to predict actual dissolved CO2 at the filler bowl temperature. When the prediction indicates CO2 will be outside spec at the filler, the agent adjusts injection pressure setpoint via Comac OPC-UA interface 45–90 seconds upstream, correcting before the product reaches the fill zone. The Quality Control agent maintains a shift-level specification adherence score and correlates DO exceedances to specific upstream events such as tank breathing, pump cavitation signatures, or incomplete CIP rinse. The Predictive Maintenance agent monitors CO2 mass-flow meter drift and injection valve seat wear, prompting calibration or replacement through the Maintenance agent's work-order queue before drift translates into out-of-spec product.
Machines & Connectivity
OT-connected, protocol-native.
Inline carbonation system injecting CO2 to volume spec before the filler bowl
Real-time CO2 volume and dissolved oxygen measurement in the product stream
Controls CO2 injection valve, product temperature compensation, and interlock with filler permissive
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| CO2 Volume in Product | CARB01.CO2.VOL | vol CO2 | 3.2–4.1 | 3.6–3.8 | Tighter |
| Dissolved Oxygen at Filler Inlet | CARB01.DO.FIL | ppb | 60–120 | ≤40 | Lower |
| Product Temperature at Carbonator | CARB01.PROD.TMP | °C | 1.5–5.0 | 2.0–3.0 | Tighter |
| CO2 Injection Pressure | CARB01.CO2.PRES | bar | 3.8–5.2 | 4.2–4.6 | Tighter |
CARB01.CO2.VOLCARB01.DO.FILCARB01.PROD.TMPCARB01.CO2.PRESIn the Field
"a carbonated beverage producer running inline mixer and filler on multiple high-speed lines, pilot targeted 50% waste reduction, generalizable across sister plants in the group"
Deployed at a carbonated beverage producer running inline mixer and filler on multiple high-speed lines, pilot targeted 50% waste reduction, generalizable across sister plants in the group. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.