Food Production · Protein & Meat Processing
Cook Line HACCP Compliance & Yield
Eliminate CCP deviations and recover yield margin by tightening cook line control to ±1°F.
How Allie Works Here
From signal to action in real time.
The Process Control agent monitors COOK01.CCP2.TMP at 1-second intervals and compares against the HACCP plan's critical limit of 158°F for a minimum 15-second dwell. If the tag drifts below 157°F, the agent triggers an automatic dwell-time extension via OPC-UA write to the conveyor speed setpoint, logs the corrective action to the USDA-compliant SCADA record, and sends an immediate alert to the food safety lead. The Quality Control agent correlates Cognex color scores with CCP temperature history in a rolling 20-batch window, identifying which zone temperature profiles predict optimal cook yield before the batch exits the line. The Predictive Maintenance agent monitors steam regulator valve hysteresis and probe RTD drift, scheduling calibration during planned sanitation windows, and the Maintenance agent surfaces the relevant USDA-traceability work-order template with one-tap acknowledgment for the maintenance lead.
Machines & Connectivity
OT-connected, protocol-native.
Continuous steam cooking with four independent temperature zones and internal product probe
SCADA historian archiving all CCP tags for USDA traceability
Vision system measuring product color, cross-section area, and surface texture post-cook
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Internal Product Temp at CCP-2 | COOK01.CCP2.TMP | °F | 153–162 | 158–161 | Tighter |
| Steam Zone 2 Dwell Time | COOK01.Z2.DWELL | s | 180–240 | 195–215 | Tighter |
| Cook Yield % | COOK01.YIELD.PCT | % | 83.1–87.6 | 86.2–88.0 | Higher |
| CCP Deviation Events per Shift | COOK01.CCP.DEV | events | 3.2 | 0.4 | Lower |
COOK01.CCP2.TMPCOOK01.Z2.DWELLCOOK01.YIELD.PCTCOOK01.CCP.DEVIn the Field
"a USDA-inspected fully cooked protein manufacturer processing 400,000 lbs per week across two cook lines"
Deployed at a USDA-inspected fully cooked protein manufacturer processing 400,000 lbs per week across two cook lines. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.