Food Production · Bakery & Snacks
Continuous Mixer OEE Optimization
Eliminate dosing jams and motor trips by detecting mixer variance 90 seconds before throughput degrades.
How Allie Works Here
From signal to action in real time.
The Production Optimization agent monitors MIX01.MTR.AMP against a rolling 20-minute baseline segmented by active recipe code. When amperage variance exceeds 1.5 sigma, the Process Control agent queries ingredient dosing flow tags and correlates the deviation to a specific ingredient surge. It triggers a setpoint adjustment on the dosing pump via OPC-UA write, logs the correction in the MES as an auto-adjustment event, and escalates to the line supervisor only if the correction does not stabilize within 90 seconds. In parallel, the Predictive Maintenance agent watches the mixer drive's current signature and dosing pump seal health, flagging bearing degradation or seal wear hours before they would otherwise surface as a microstop, and links each predictive alert to the relevant SOP and prior work-order history surfaced via the Maintenance agent.
Machines & Connectivity
OT-connected, protocol-native.
Mixes dry and liquid ingredients at controlled shear rates; primary process variable source
Controls mixer speed setpoints, discharge gate timing, and interlocks
Measures liquid ingredient mass flow for recipe adherence
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Mixer Motor Amperage | MIX01.MTR.AMP | A | 42–58 | 44–52 | Tighter |
| Dough Exit Temperature | MIX01.TMP.EXIT | °C | 35–44 | 36–39 | Tighter |
| Specific Mechanical Energy | MIX01.SME.CALC | Wh/kg | 9.2–14.1 | 10.5–12.0 | Tighter |
| Ingredient Dosing Deviation | MIX01.DOSE.ERR | % | ±2.4 | ±0.8 | Tighter |
MIX01.MTR.AMPMIX01.TMP.EXITMIX01.SME.CALCMIX01.DOSE.ERRIn the Field
"a Tier-1 sweet goods manufacturer operating four continuous mix lines in the US Southeast"
Deployed at a Tier-1 sweet goods manufacturer operating four continuous mix lines in the US Southeast. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.