Food Production · Protein & Meat Processing
Chilling Cycle Efficiency
Cut ammonia compressor energy by over 20% while extending MTBF through predictive bearing monitoring.
How Allie Works Here
From signal to action in real time.
The Energy Optimization agent monitors compressor suction/discharge ratios across the ammonia loop in real time and adjusts compressor staging via Johnson Controls Metasys API to match actual thermal load, eliminating the fixed 4-compressor-always-on baseline. The Predictive Maintenance agent analyzes motor amperage trends and vibration data from accelerometers on the two primary compressors, flagging subtle bearing degradation signatures 2–4 hours before threshold breach. The Process Control agent manages defrost scheduling dynamically based on evaporator coil frost-load estimation, replacing the fixed time-based schedule.
Machines & Connectivity
OT-connected, protocol-native.
Spiral blast-chilling to 35°F internal product temperature; ammonia refrigeration system
Building automation system controlling ammonia compressor staging and evaporator fan speeds
Suction and discharge pressure monitoring on the ammonia compressor loop
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Suction Pressure (Compressor Inlet) | CHILL01.COMP.SUCT | psig | 14–22 | 17–20 | Tighter |
| Product Core Temp at Spiral Exit | CHILL01.PROD.CORE | °F | 32–41 | 35–38 | Tighter |
| Compressor kWh per Tonne Chilled | CHILL01.KWH.TON | kWh/t | 38–52 | 31–38 | Lower |
| Defrost Cycle Frequency | CHILL01.DEF.FREQ | cycles/day | 6.2 | 3.8 | Lower |
CHILL01.COMP.SUCTCHILL01.PROD.CORECHILL01.KWH.TONCHILL01.DEF.FREQIn the Field
"a large-scale poultry processing facility operating three spiral chillers with a combined capacity of 240 tonnes per day"
Deployed at a large-scale poultry processing facility operating three spiral chillers with a combined capacity of 240 tonnes per day. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.