Food Production · Bakery & Snacks

Changeover Reduction

Pre-stage recipes and benchmark SMED execution to slash changeover time by over a third.

−38%
Changeover Time
−71%
First-Article Rejects
+22 pts
Planning Adherence

How Allie Works Here

From signal to action in real time.

Production PlanningProduction Optimization

The Production Planning agent sequences SKU orders to minimize changeover complexity by grouping similar film widths and seal temperatures. At T-minus 15 minutes before each scheduled changeover, it pushes the next recipe parameters to the Optima CF OPC-UA recipe server, sends a task notification to the operator on shift, and pre-warms the seal bar to the target temperature. The Production Optimization agent monitors changeover execution in real time, comparing elapsed time against the SMED benchmark, and escalates only if the line has not confirmed 'First Article Pass' within the target window.

Machines & Connectivity

OT-connected, protocol-native.

Optima CF Packaging Line
Optima Packaging Group
OPC-UA

Primary flow-wrapping line; recipe parameters define film tension, seal temperature, and dwell time

Mettler-Toledo X37 X-Ray Inspection
Mettler-Toledo
EtherNet/IP

Inline weight and foreign body detection; recipe-specific reject thresholds

Omron NX1P2 PLC
Omron
EtherNet/IP

Coordinates recipe download, tooling unlock, and CIP permissive interlock

Process Variables

The signals Allie monitors and moves.

Changeover DurationLower
PACK01.CO.DUR
Baseline: 47 min29 min
First-Article Inspection Pass TimeLower
PACK01.FA.PASS
Baseline: 18 min8 min
Film Tension at Recipe ActivationTighter
PACK01.FLM.TEN
Baseline: ±12% N±3% N

In the Field

"a multi-SKU snack manufacturer running six packaging lines with an average of 12 SKU changeovers per shift"

Deployed at a multi-SKU snack manufacturer running six packaging lines with an average of 12 SKU changeovers per shift. The results above reflect production data from the 60–90 day period following full deployment.

−38%changeover time
−71%first-article rejects
+22 ptsplanning adherence

Next Step

See what your lines are actually capable of.

A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.