Consumer Packaged Goods · Home & Personal Care
Packaging Line Throughput
Add 2.7M units per month by sustaining maximum safe wrapper speed and eliminating film splice events.
How Allie Works Here
From signal to action in real time.
The Production Optimization agent monitors wrapper speed and vision reject rate simultaneously, detecting the inverse correlation between aggressive speed increases and seal quality degradation. It holds speed at the highest sustainable point where the reject rate stays below 0.9% rather than simply maximizing the setpoint. The Predictive Maintenance agent analyzes SEW servo drive current signatures at the jaw axis and film feed axis, detecting bearing wear, eccentricity, and backlash 6–12 hours before the mechanical failure that would cause an unplanned stop. It pre-schedules maintenance tasks in the CMMS during the next planned PM window.
Machines & Connectivity
OT-connected, protocol-native.
Primary horizontal flow-wrapper for flexible pouches; speed and sealing are the throughput constraints
Inline print and seal quality inspection; reject gate controlled by vision pass/fail signal
Servo drive controller for film feed, seal pressure, and infeed timing axes
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Wrapper Speed | WRAP01.SPD.PPM | pkg/min | 280–340 | 330–340 | Higher |
| Seal Bar Temperature Deviation | WRAP01.SEAL.DEV | °C | ±9 | ±2 | Tighter |
| Film Splice Events per Shift | WRAP01.SPLIC.CNT | splices/shift | 4.2 | 1.8 | Lower |
| Vision Reject Rate | WRAP01.VIS.REJ | % | 1.8–3.4 | 0.4–0.9 | Lower |
WRAP01.SPD.PPMWRAP01.SEAL.DEVWRAP01.SPLIC.CNTWRAP01.VIS.REJIn the Field
"a multi-category food group operating 14+ filling and packaging lines across two plants, pilot deployed on the highest-volume flow-wrapper SKU first, then replicated across the line cluster"
Deployed at a multi-category food group operating 14+ filling and packaging lines across two plants, pilot deployed on the highest-volume flow-wrapper SKU first, then replicated across the line cluster. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.