Consumer Packaged Goods · Assembly & Final Pack
Microstop Root Cause Elimination
Go from patching microstops to eliminating them, reducing the rate from 12.4 to 2.8 per 1,000 units.
How Allie Works Here
From signal to action in real time.
The Production Optimization agent classifies each microstop by duration, axis, and upstream component state using a decision-tree model trained on 6 months of historian data. Rather than logging 'conveyor jam' generically, it identifies that 71% of jams correlate to one specific Bosch Rexroth gripper axis torque spike pattern that occurs when component tray presentation is off by more than 1.2mm. The Predictive Maintenance agent monitors all 6 servo axes for torque signature drift, predicting gripper wear with sufficient lead time to schedule replacement during a planned PM window rather than reactively.
Machines & Connectivity
OT-connected, protocol-native.
Servo-driven assembly pick-and-place with 6 axes; each axis generates current and torque tags
Assembly verification scanner confirming component identity at 3 stations on the assembly line
Assembly cell PLC controlling all servo sequences, I/O, and upstream accumulation buffers
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Pick-and-Place Cycle Time | ASSY01.PP.CYCLE | ms | 420–680 | 405–430 | Tighter |
| Microstop Duration per Event | ASSY01.MSTOP.DUR | s | 8–45 | 8–12 | Lower |
| Microstops per 1,000 Units | ASSY01.MSTOP.RATE | stops/1K | 12.4 | 2.8 | Lower |
| Servo Torque at Gripper Axis | ASSY01.SRV.TRQ | Nm | ±18% | ±5% | Tighter |
ASSY01.PP.CYCLEASSY01.MSTOP.DURASSY01.MSTOP.RATEASSY01.SRV.TRQIn the Field
"a Tier-1 personal care product manufacturer running a 6-axis servo assembly cell at 95 units/min target rate"
Deployed at a Tier-1 personal care product manufacturer running a 6-axis servo assembly cell at 95 units/min target rate. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.