Consumer Packaged Goods · Assembly & Final Pack
Label & Vision Inspection Integration
Extend print head life by 2.5× and recover 42,000 saleable units per month by eliminating false rejects.
How Allie Works Here
From signal to action in real time.
The Quality Control agent maintains per-SKU vision pass/fail models updated with each production run, automatically tightening or relaxing inspection thresholds based on the print head age curve learned from Domino OPC-UA diagnostics data. When OCR read rate on date codes drops below 99.2%, the leading indicator for impending print head degradation, the agent schedules a head clean during the next micro-break rather than waiting for a hard fail. The Production Optimization agent analyzes the false reject pattern in real time and distinguishes mechanical misalignment rejects from true print defects, enabling targeted corrective action rather than blanket threshold relaxation.
Machines & Connectivity
OT-connected, protocol-native.
High-resolution date, lot, and barcode printing on primary packages at line speed
100% print quality and label position inspection with configurable pass/fail logic per SKU
Reject gate sequencing controller receiving fail signals from vision system with configurable delay compensation
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Vision First-Pass Yield | INSP01.VIS.FPY | % | 96.8–98.2 | 99.4–99.8 | Higher |
| OCR Read Rate on Date Code | INSP01.OCR.RATE | % | 97.1 | 99.7 | Higher |
| False Reject Rate | INSP01.FALSE.REJ | % | 0.8–1.6 | 0.1–0.2 | Lower |
| Print Head Maintenance Interval | INSP01.PRNT.INT | hours | 168 | 420 | Higher |
INSP01.VIS.FPYINSP01.OCR.RATEINSP01.FALSE.REJINSP01.PRNT.INTIn the Field
"a CPG contract manufacturer running 8 packaging lines with strict retail compliance requirements for date code legibility"
Deployed at a CPG contract manufacturer running 8 packaging lines with strict retail compliance requirements for date code legibility. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.