Liquids & Drinks · Beer & Brewing
Pasteurizer Energy & Control
Tighten pasteurization units to ±3 PU while cutting steam consumption by 18% per hectoliter.
How Allie Works Here
From signal to action in real time.
The Process Control agent computes real-time Pasteurization Units from holding tube temperature and product flow rate, comparing against the certified process schedule stored in the MES. When PU trending indicates risk of under-processing, the agent adjusts the steam valve setpoint via Siemens PCS 7 OPC-UA interface to tighten holding temperature without stopping flow. The Energy Optimization agent monitors steam consumption per hectoliter across the shift and recommends steam header pressure reductions during off-peak production windows, reducing energy cost without impacting microbiological compliance. The Predictive Maintenance agent tracks plate gasket leak signatures and heat exchanger fouling rate (ΔP-vs-flow trajectory), pre-scheduling plate inspections via the Maintenance agent, with the relevant Alfa Laval service procedure and prior gasket-replacement history attached to the work order.
Machines & Connectivity
OT-connected, protocol-native.
Flash pasteurization at 72°C for 15 seconds; multiple holding tube temperature zones
Volumetric flow measurement for throughput and energy-per-hectoliter calculation
Distributed Control System managing all temperature, flow, and CIP permissives for the pasteurizer block
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Holding Tube Temperature | PAST01.HOLD.TMP | °C | 70–76 | 72–73 | Tighter |
| Steam Consumption per hL | PAST01.STM.HL | kg/hL | 1.8–2.6 | 1.6–1.9 | Lower |
| Flow Rate | PAST01.FLOW.HL | hL/hr | 280–340 | 320–340 | Higher |
| Pasteurization Units Delivered | PAST01.PU.CALC | PU | 12–28 | 16–22 | Tighter |
PAST01.HOLD.TMPPAST01.STM.HLPAST01.FLOW.HLPAST01.PU.CALCIn the Field
"a Latin American brewer operating beer and soft drink lines across multiple plants, pasteurization improvements rolled into a Siemens-referenced reference architecture"
Deployed at a Latin American brewer operating beer and soft drink lines across multiple plants, pasteurization improvements rolled into a Siemens-referenced reference architecture. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.