Liquids & Drinks · CSD & Juice

Filler Changeover & Recipe Execution

Pre-validate 140+ recipes and eliminate recipe mismatch events entirely through MES-driven pre-staging.

−41%
Changeover Time
−76%
Startup Waste
Zero
Recipe Accuracy Events

How Allie Works Here

From signal to action in real time.

Production PlanningProduction OptimizationProcess Control

The Production Planning agent integrates with the MES work order queue and pushes the next 3 scheduled recipes to the KHS OPC-UA server 20 minutes before each planned changeover, enabling pre-validation of mechanical position parameters. The Process Control agent compares live actuator feedback positions to recipe nominal values after each format adjustment and flags any deviations exceeding tolerance before the line restart is authorized. The Production Optimization agent monitors the startup ramp curve, product count rate from first unit to steady state, and alerts if startup waste will exceed the target before it does.

Machines & Connectivity

OT-connected, protocol-native.

KHS Innopack Kisters SP Shrink Packer
KHS Group
OPC-UA

Multi-format secondary packaging with 140+ stored recipes; format changes require mechanical and recipe adjustments

Omron Sysmac NJ501 PLC
Omron
EtherNet/IP

Controls can/bottle guide rail positions, lane dividers, and label applicator registration

Zebra ZT510 Industrial Printer-Applicator
Zebra Technologies
EtherNet/IP

Case label printing and application with recipe-driven content from MES work order

Process Variables

The signals Allie monitors and moves.

Recipe Download Confirmation TimeLower
PACK02.RCP.CNF
Baseline: 240–480 s45–90 s
Changeover DurationLower
PACK02.CO.DUR
Baseline: 38–65 min22–28 min
Post-Changeover Startup RejectsLower
PACK02.STR.REJ
Baseline: 180–340 units40–80 units
Label Position AccuracyTighter
PACK02.LBL.ACC
Baseline: ±3.2 mm±0.8 mm

In the Field

"a major juice co-packer managing over 200 active SKUs across three secondary packaging lines"

Deployed at a major juice co-packer managing over 200 active SKUs across three secondary packaging lines. The results above reflect production data from the 60–90 day period following full deployment.

−41%changeover time
−76%startup waste
Zerorecipe accuracy events

Next Step

See what your lines are actually capable of.

A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.