Liquids & Drinks · CSD & Juice
Filler Changeover & Recipe Execution
Pre-validate 140+ recipes and eliminate recipe mismatch events entirely through MES-driven pre-staging.
How Allie Works Here
From signal to action in real time.
The Production Planning agent integrates with the MES work order queue and pushes the next 3 scheduled recipes to the KHS OPC-UA server 20 minutes before each planned changeover, enabling pre-validation of mechanical position parameters. The Process Control agent compares live actuator feedback positions to recipe nominal values after each format adjustment and flags any deviations exceeding tolerance before the line restart is authorized. The Production Optimization agent monitors the startup ramp curve, product count rate from first unit to steady state, and alerts if startup waste will exceed the target before it does.
Machines & Connectivity
OT-connected, protocol-native.
Multi-format secondary packaging with 140+ stored recipes; format changes require mechanical and recipe adjustments
Controls can/bottle guide rail positions, lane dividers, and label applicator registration
Case label printing and application with recipe-driven content from MES work order
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Recipe Download Confirmation Time | PACK02.RCP.CNF | s | 240–480 | 45–90 | Lower |
| Changeover Duration | PACK02.CO.DUR | min | 38–65 | 22–28 | Lower |
| Post-Changeover Startup Rejects | PACK02.STR.REJ | units | 180–340 | 40–80 | Lower |
| Label Position Accuracy | PACK02.LBL.ACC | mm | ±3.2 | ±0.8 | Tighter |
PACK02.RCP.CNFPACK02.CO.DURPACK02.STR.REJPACK02.LBL.ACCIn the Field
"a major juice co-packer managing over 200 active SKUs across three secondary packaging lines"
Deployed at a major juice co-packer managing over 200 active SKUs across three secondary packaging lines. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.