Consumer Packaged Goods · Home & Personal Care
Quality Deviation Detection & Response
Cut time-to-contain from 31 minutes to under 3, tracing the root cause to the upstream machine within 90 seconds.
How Allie Works Here
From signal to action in real time.
The Quality Control agent fuses Keyence vision scores, checkweigher Cpk, and date coder verification signals into a unified Quality Index updated every 10 seconds. When the index drops below threshold, the agent traces the deviation signature back through historian tags to the upstream process event that caused it, such as a filler nozzle drip, a cap torque variation, or a label roll splice, within 90 seconds of the first failing unit. The Process Control agent automatically adjusts the upstream parameter and issues a containment boundary: 'hold from unit X to current' with a single confirmation tap from the quality lead.
Machines & Connectivity
OT-connected, protocol-native.
100% inline label and cap inspection for 12 quality attributes on each unit at line speed
Dynamic weighing at up to 400 units/min with statistical process control output
Line controller integrating vision, checkweigher, and date coder reject gates into unified hold/pass logic
Process Variables
The signals Allie monitors and moves.
| Signal Name | Historian Tag | Unit | Baseline | Optimized | Target |
|---|---|---|---|---|---|
| Checkweigher Cpk | QA01.CWH.CPK | Cpk | 0.9–1.3 | 1.6–2.1 | Higher |
| Label Defect Reject Rate | QA01.LBL.REJ | % | 0.8–2.1 | 0.1–0.3 | Lower |
| Time-to-Contain on Quality Alert | QA01.TTC.MIN | min | 18–45 | 2–4 | Lower |
| Quality Hold Inventory | QA01.HOLD.UNITS | units | 4,200–8,800 | 200–600 | Lower |
QA01.CWH.CPKQA01.LBL.REJQA01.TTC.MINQA01.HOLD.UNITSIn the Field
"a multi-national HPC manufacturer producing 3 product lines across a single site with strict retail compliance requirements"
Deployed at a multi-national HPC manufacturer producing 3 product lines across a single site with strict retail compliance requirements. The results above reflect production data from the 60–90 day period following full deployment.
Next Step
See what your lines are actually capable of.
A 30-minute operational assessment. We review your OT/IT setup, identify the highest-ROI deployment, and deliver a scoped pilot proposal.